To increase the performance of the office operations of a company in the healthcare sector, which was already equipped by us with computer virtualization for full computer backups and uninterruptible hardware replacement, an increase in performance was required. There was also a desire to protect the entire IT system against power failures.
The work could be carried out without interrupting operations and mainly remotely.
SERVICES
Procedure List
- Inventory survey
- Technology selection and procurement
- Installation of new servers with hardware and software
- Over-night relocation of the machines
- Installation and integration of a UPS with signaling mechanisms for short-term bridging and emergency shutdown
- Testing
- Operational support
Classified Sercices
- Business and IT Consulting (70)
- Structure
- Technologic
- Operational Support (61)
- Implementation
- Training
- Project and Interim Management (67)
- Company
- Customer
- Projects
- Project implementation (63)
SUCCESSES
- Simple and fast project implementation thanks to solid infrastructure, stable structures and processes, as well as good documentation of all systems (pre-project)
- Convincing proof of previous service quality
- Very satisfied custome
TECHNOLOGIES & METHODS
Classified List
- Data Communication
- Data Management
- Hardware & Architectures
- M1 (43)
- NAS (13)
- Pentium (and Successor) (46)
- Router (16)
- Server Hardware (33)
- Switches (13)
- Thin Clients (9)
- Various Special Hardware (16)
- Methods & Frameworks
- Operating Systems
- Mac OS (50)
- Unix (several) (22)
- VM (several) (17)
- Windows (several)
- Windows Server (several)
- Programming Languages & Scripting
- Tools
RESPOSIBILITY
- Responsibility for the project from inventory to operational support
GENERAL CONDITIONS
- Very good IT structures, processes and documentation
- Virtualization enables major IT work to be carried out securely and without interruption
Further Classification
- Project Duration
- 3 Months
- Company Size
- Company Type
- Industries